Project number 3785/1
Project name

Clearing of 11.5 hectares of native vegetation for the purpose of expanding an extractive industry in the Shire of Harvey.

Project status Current
Proponent(s) Carbone Bros Pty Ltd
Project location

LOT 5 ON DIAGRAM 30278 MYALUP 6220

Project bioregion(s) Swan Coastal Plain
Assessment criteria (b) it comprises the whole or a part of, or is necessary for the maintenance of, a significant habitat for fauna indigenous to Western Australia.
Residual impact

Loss of up to 11.5 hectares of native vegetation in degraded (Keighery 1994) condition that includes approximately 115 mature tuart trees providing foraging and potential breeding habitat for black cockatoos.

Offset conditions

7. Offset - Rehabilitation

In relation to the areas hatched red on attached Plan 3785/1b the Permit Holder must implement and adhere to the Pit Rehabilitation and Maintenance Management Plan, Lot 5 Old Coast Road, Myalup, June 2013, attached as Appendix A to this permit.

Statutory process EP Act Clearing (Part V)
Approved project area (ha) 11.5

Decision(s):

DECISION 1
Date: 2013-07-18 Ministerial statement: None
OFFSET 1
Condition status: Current
Type(s): Rehabilitation
Rationale:

The offset will result in the planting of 900 trees (mix of tuart and peppermint trees) within an area of approxiamtely 2.7 hectares of the Lot authorised to be cleared under the Permit.

The offset will result in a net gain of native vegetation considered suitable as black cockatoo habitat. This offset is considered to be relevant and proportionate to the significance of the environmental value being impacted, mitigating the residual impacts of the project.

Security arrangements:

Lot 5 on Diagram 30278 is freehold land.

Governance arrangements:

Offset location:

Lot 5 on Diagram 30278, 6684 Old Coast Road, Myalup, 6220.

Approved offset area (ha): 2.7
Bioregion(s): Swan Coastal Plain
Delivery agent:

Document attachments:
CONDITION MILESTONE 1
Milestone:

Condition Milestone 1 - relates to Permit condition 7

In relation to the areas hatched red on attached Plan 3785/1b the Permit Holder must implement and adhere to the Pit Rehabilitation and Maintenance Management Plan, Lot 5 Old Coast Road, Myalup, June 2013, attached as Appendix A to this permit.

Timeframe:

Prior to the expiry of the permit.

Timeframe (date): 2021-05-31
Complete: No
IMPLEMENTATION MILESTONE 1
Milestone:

Implementation Milestone 1 - relates to Condition Milestone 2

In accordance with the approved offset proposal, Carbone Bros Pty Ltd is to implement the “Pit Rehabilitation and Maintenance Management Plan, Lot 5 Old Coast Road, Myalup, June 2013” which includes, but is not limited to, the following requirements:

Site preparation:
- ground preparation including contouring and ripping
- initial weed management

Vegetation establishment:
- planting of 900 trees including tuart and peppermint trees

Monitoring:
- for physical stability of the landform, success of germination and emergence of weeds
- using survival counts

Remedial actions:
- weed control
- repair of erosion damage
- replanting/seeding areas that may not have regenerated

Completion criteria:
- successful establishment of 100% of all plants after 4 years
- site is sustainable in the long term without additional management inputs

Timeframe:

Site preparation: prior to vegetation establishment.
Vegetation establishment: Site 1 2015-17, Site 2 2017-19, Site 3 2019-21.
Monitoring: on a weekly basis just after planting and annually thereafter.
Remedial actions: as required.
Completion target: 2021.

Complete: No