| Project number | OEPA:188 |
|---|---|
| Project name | Exploration Drilling Feral Prospect |
| Project status | Current |
| Proponent(s) | Hermitage Holdings Pty Ltd (ACN 009 157 591) Devereux Nominees Pty Ltd (ACN 008 850 860) Pinecroft Pty Ltd (ACN 009 125 893) Paloma Holdings Pty Ltd (ACN 009 210 262) |
| Project location | Approximately 9km north-east of the town of Perenjori in the Midwest region of Western Australia |
| Project bioregion(s) | Avon Wheatbelt |
| Assessment criteria | Flora and Vegetation, Terrestrial Fauna |
| Residual impact | Clearing of no more than 3.24ha of vegetation in very good to excellent condition that hosts endemic and restricted flora and vegetation and conservation significant fauna species |
| Offset conditions | 8 Provisional Offset 8-1 If, the monitoring required by condition 7-2(6) has not demonstrated that the rehabilitation success criteria required by condition 7-2(5) has been met within 5 years of cessation of drilling, and the CEO determines that implementation of the proposal has resulted in a significant residual impact, the CEO may direct the proponent to prepare and implement an Offset Strategy. 8-2 The value of any required Offset Strategy would be appraised to counterbalance up to 3.24 hectares of unsuccessful rehabilitation and shall be prepared to the requirements of the CEO no longer than 6 months from written notice from the CEO. |
| Statutory process | EP Act Environmental Impact Assessment (Part IV) |
| Approved project area (ha) | 3.24 |
| DECISION 1 | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Date: 2015-08-03 | Ministerial statement: 1011 | |||||||||||||||||
|
||||||||||||||||||