Project number | OEPA:155 |
---|---|
Project name | Eglinton Beach Proposal |
Project status | Current |
Proponent(s) | Eglinton Estates Pty Ltd (ACN: 009 460 397) |
Project location | Eglinton |
Project bioregion(s) | Swan Coastal Plain |
Assessment criteria | Coastal Processes, Flora and Vegetation |
Residual impact | Following implementation of avoidance and mitigation measures, the proposal will have the following significant residual impacts: |
Offset conditions | 5 Terrestrial Flora and Vegetation (Conservation Areas) 5-1 The proponent shall conserve the flora, vegetation and dune systems within the Conservation areas shown in Figure 1 of Schedule 1. 5-2 By 01 September 2015, unless agreed by the CEO, the proponent shall prepare in consultation with the Department of Parks and Wildlife and to the satisfaction of the CEO, a Conservation Area Management Plan for the Conservation areas (A, B, C & D) shown in Figure 1 of Schedule 1, and spatially defined in Schedule 3. 5-3 The proponent shall cede the Conservation areas identified in Figure 1 of Schedule 1 to a management authority approved by the CEO within 10 years of approval of the plan required in Condition 5-2. 5-4 The Conservation Area Management Plan required by Condition 5-2 shall include but is not limited to the following details: 5-5 The proponent shall implement the approved Conservation Area Management Plan for 10 years from the date of approval of the plan or until such time as the land is ceded to a management authority approved by the CEO, whichever is sooner. |
Statutory process | EP Act Environmental Impact Assessment (Part IV) |
Approved project area (ha) | 246.8 |
DECISION 1 | ||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Date: 2015-01-05 | Ministerial statement: 992 | |||||||||||||||||||||||||||||
|