Project number 2493/4
Project name

Mundijong Road extension including associated road upgrades and works within the Parmelia Gas Pipeline Easement.

Project status Complete
Proponent(s) City of Rockingham
Project location

LOT 288 ON PLAN 202704 BALDIVIS 6171
LOT 2209 ON PLAN 211650 BALDIVIS 6171
LOT 777 ON PLAN 3893 LEDA 6170
LOT 478 ON PLAN 27774 COOLOONGUP 6168
LOT 4335 ON PLAN 11170 LEDA 6170
UNALLOCATED CROWN LAND LEDA 6170
LOT 776 ON PLAN 3893 LEDA 6170
LOT 503 ON PLAN 56798 LEDA 6170
LOT 4639 ON PLAN 27786 LEDA 6170
ROAD RESERVE COOLOONGUP 6168
LOT 283 ON PLAN 202704 BALDIVIS 6171
LOT 1387 ON PLAN 218497 BALDIVIS 6171
LOT 6 ON DIAGRAM 51529 BALDIVIS 6171
LOT 5 ON DIAGRAM 51529 BALDIVIS 6171
LOT 290 ON PLAN 202704 BALDIVIS 6171
LOT 291 ON PLAN 202704 BALDIVIS 6171
LOT 292 ON PLAN 202704 BALDIVIS 6171
LOT 292 ON PLAN 202704 BALDIVIS 6171
LOT 776 ON PLAN 3893 LEDA 6170
LOT 3 ON DIAGRAM 45369 BALDIVIS 6171
ROAD RESERVE BALDIVIS 6171
LOT 34 ON DIAGRAM 97594 BALDIVIS 6171
ROAD RESERVE BALDIVIS 6171

Project bioregion(s) Swan Coastal Plain
Assessment criteria (b) it comprises the whole or a part of, or is necessary for the maintenance of, a significant habitat for fauna indigenous to Western Australia., (f) it is growing in, or in association with, an environment associated with a watercourse or wetland., (h) the clearing of the vegetation is likely to have an impact on the environmental values of any adjacent or nearby conservation area.
Residual impact

Clearing of 11.9 hectares of native vegetation that includes:
- foraging habitat for Carnaby's black cockatoo;
- vegetation which has value as part of an ecological corridor;
- vegetation growing in, or in association with, two conservation category wetlands (approximately 1.5 hectares growing in association with Coolongup Lake and approximately 0.2 hectares growing in association with Kerosene Lane Swamp); and
- vegetation forming part of Bush Forever site 356 (approximately 0.95 hectares).

The area to be cleared may also contain native vegetation representative of the Priority Ecological Community (PEC) Floristic Community Type (FCT) SCP 24 "Northern Spearwood shrublands and woodlands" (Priority 3).

Offset conditions

10. Offsets

The permit holder must implement and adhere to the offset proposal 'Mundijong Road extension - Environmental Offsets Strategy, 15 April 2009' and to 'Attachment A; Proposed Rehabilitation Methods and Measurement, 5 May 2009'.

Statutory process EP Act Clearing (Part V)
Approved project area (ha) 11.9

Decision(s):

DECISION 1
Date: 2013-08-01 Ministerial statement: None
OFFSET 1
Condition status: Complete
Type(s): Onground management, Rehabilitation
Rationale:

This offset involves the onground management of a 79.2 hectare portion of Bush Forever site 356. The site contains foraging habitat for Carnaby's cockatoo and vegetation which has value as an ecological corridor. The site also contains two resource enhancement category damplands totalling approximately 1.4 hectares. The offset includes undertaking rehabilitation to support and buffer these damplands.

When combined with offset 2, a total of 86.7 hectares will be actively managed by the permit holder for the purpose of improving the condition and value of the existing remnant native vegetation. Both offsets also involve rehabilitation to support and buffer wetland areas.

Given the above, the two offsets combined are considered relevant and proportionate to the significance of the environmental values being impacted, addressing the residual impacts.

Security arrangements:

The offset site is a Bush Forever site vested with the Western Australian Planning Commission.

Governance arrangements:

Offset location:

Portions of the following properties:
- Lot 902 on Plan 50998, Dixon Rd, Hillman
- Lot 50 on Diagram 41627, Dixon Rd, Hillman
- Day Road road reserve (PIN 11758190)
- Lot 143 on Plan 69116, Hillman
- Lot 141 on Plan 69115 (Crown Reserve 43147), Darile St, Hillman
- Lot 10 on Plan 6980, Dixon Rd, Hillman
- Lot 125 on Plan 69114, Dixon Rd, Hillman
- Lot 126 on Plan 69114, Dixon Rd, Hillman
- Lot 127 on Plan 69114, Dixon Rd, Hillman
- Lot 128 on Plan 69114, Dixon Rd, Hillman
- Lot 129 on Plan 69114, Dixon Rd, Hillman
- Lot 130 on Plan 69114, Dixon Rd, Hillman
- Lot 131 on Plan 69114, Dixon Rd, Hillman

Approved offset area (ha): 79.2
Bioregion(s): Swan Coastal Plain
Delivery agent:

CONDITION MILESTONE 1
Milestone:

Condition Milestone 1 - relates to permit condition 10

The permit holder must implement and adhere to the offset proposal 'Mundijong Road extension - Environmental Offsets Strategy, 15 April 2009' and to 'Attachment A; Proposed Rehabilitation Methods and Measurement, 5 May 2009'.

Timeframe:

For the term of the permit.

Complete: No
IMPLEMENTATION MILESTONE 1
Milestone:

Implementation Milestone 1

In accordance with the 'Mundijong Road extension - Environmental Offsets Strategy, 15 April 2009', the permit holder is to implement a range of activities which include, but are not limited to, the following:
- install and maintain agricultural fencing;
- reassess and rationalise walking paths and public access;
- install recovered logs/hollows from the area cleared for the Mundijong Rd extension works;
- undertake weed management;
- plant/seed native vegetation to support and buffer two resource enhancement category damplands; and
- commission a post-rehabilitation wetland and vegetation survey.

Timeframe:

Fencing/paths/access - targeted for 2009 and as required thereafter.
Installation of logs/hollows - post-clearing of the Mundijong Rd extension alignment.
Weed management - to be undertaken annually for at least 10 years.
Planting/seeding - targeted for 2010.
Post-rehabilitation survey - spring 2014.

Complete: No
IMPLEMENTATION MILESTONE 2
Milestone:

Implementation Milestone 2

In accordance with 'Attachment A; Proposed Rehabilitation Methods and Measurement, 5 May 2009', the success criterion for the offset is 'rehabilitation of native vegetation to a condition that will, in the future, likely support a self-sustaining plant community with improved density and diversity'.

The success of the offset will be assessed through a survey of the offset area. The survey will include, but is not limited to, the assessment of vegetation condition, species density, diversity and structure. The survey will determine any requirements for further active management.

Timeframe:

The survey will be undertaken in spring 2014. Any further active management will be undertaken as required up to 2021.

Complete: No
OFFSET 2
Condition status: Complete
Type(s): Onground management, Rehabilitation
Rationale:

This offset includes the onground management of a 7.5 hectare area, the majority of which forms part of the Anstey Swamp conservation category wetland. The offset also includes a rehabilitation component.

When combined with offset 1, a total of 86.7 hectares will be actively managed by the permit holder for the purpose of improving the condition and value of the existing remnant native vegetation. Both offsets also involve rehabilitation to support and buffer wetland areas.

Given the above, the two offsets combined are considered relevant and proportionate to the significance of the environmental values being impacted, addressing the residual impacts.

Security arrangements:

The offset site is a Crown Reserve with a purpose of public recreation under the management of the City of Rockingham. The security of the site will be improved through registering a conservation covenant on the certificate of title of the property.

Governance arrangements:

Offset location:

Lot 4060 on Diagram 80616 (Crown Reserve 42604), Dampier Drive, Golden Bay

Approved offset area (ha): 7.5
Bioregion(s): Swan Coastal Plain
Delivery agent:

CONDITION MILESTONE 1
Milestone:

Condition Milestone 1 - relates to permit condition 10

The permit holder must implement and adhere to the offset proposal 'Mundijong Road extension - Environmental Offsets Strategy, 15 April 2009' and to 'Attachment A; Proposed Rehabilitation Methods and Measurement, 5 May 2009'.

Timeframe:

For the term of the permit.

Complete: No
IMPLEMENTATION MILESTONE 1
Milestone:

Implementation Milestone 1

In accordance with the 'Mundijong Road extension - Environmental Offsets Strategy, 15 April 2009', the permit holder is to implement a range of activities which include, but are not limited to, the following:
- arrange a conservation covenant for the offset area;
- commission a baseline spring flora and fauna survey for the offset area;
- install and maintain agricultural fencing;
- reassess and rationalise walking paths and public access;
- install recovered logs/hollows from the area cleared for the Mundijong Rd extension works;
- undertake weed management;
- plant/seed native vegetation; and
- commission a post-rehabilitation wetland and vegetation survey for the offset area.

Timeframe:

Conservation covenant - targeted for 2009.
Baseline survey - spring 2009.
Fencing/paths/access - targeted for 2009 and as required thereafter.
Installation of logs/hollows - post-clearing of the Mundijong Rd extension alignment.
Weed management - to be undertaken annually for at least 10 years.
Planting/seeding - targeted for 2010.
Post-rehabilitation survey - spring 2014.

Complete: No
IMPLEMENTATION MILESTONE 2
Milestone:

Implementation Milestone 2

In accordance with 'Attachment A; Proposed Rehabilitation Methods and Measurement, 5 May 2009', the success criterion for the offset is 'rehabilitation of native vegetation to a condition that will, in the future, likely support a self-sustaining plant community with improved density and diversity'.

The success of the offset will be assessed through a survey of the offset area. The survey will include, but is not limited to, the assessment of vegetation condition, species density, diversity and structure. The survey will determine any requirements for further active management.

Timeframe:

The survey will be undertaken in spring 2014. Any further active management will be undertaken as required up to 2021.

Complete: No