Project number | OEPA:65 |
---|---|
Project name | Gorgon Gas Development Barrow Island - Additional Construction Laydown and Operations Support Area |
Project status | Current |
Proponent(s) | Chevron Australia Pty Ltd (ACN 086 197 757) |
Project location | Barrow Island |
Project bioregion(s) | Carnarvon |
Assessment criteria | Flora and Vegetation, Terrestrial Fauna |
Residual impact | The implementation of the proposal will result in a significant residual impact of permanent disturbance of up to 32 ha of Class A Nature Reserve including habitat for specially protected fauna under the Wildlife Conservation Act 1950. |
Offset conditions | 1-1 To offset the significant residual impact caused by the Proposal on up to 32 hectares of a Class A Nature Reserve including habitat for specially protected fauna under the Wildlife Conservation Act 1950, the Proponent shall provide an additional contribution to the Threatened Species Translocation and Reintroduction Program, managed by the State, and referred to in point 3 of the Preamble of Ministerial Statement No. 800. The additional contribution, will accord with the current funding contributions provided for in the Program, but will extend it for a further two years. 1-2 Should the Proponent demonstrate that rehabilitation has substantially commenced for any area within the development envelope shown in Figure 1 of Schedule 1 in accordance with the Post-Construction Rehabilitation Plan, identified in condition 32 of Ministerial Statement No. 800, within five years of the date of this Statement, the CEO may approve a reduction in the contribution required under Condition 1-1. |
Statutory process | EP Act Environmental Impact Assessment (Part IV) |
Approved project area (ha) | 32.0 |
DECISION 1 | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Date: 2014-04-02 | Ministerial statement: 965 | |||||||||||||||||
|