Project number 5206/1
Project name

Clearing of 0.74 hectares of native vegetation for the purpose of building a carpark and hardstand construction.

Project status Current
Proponent(s) Colin Michael Piacentini
Project location

LOT 300 ON PLAN 72189 PICTON 6229

Approved project area (ha) 0.74

Decision(s):

DECISION 1 Date of decision: 11 Oct 2012
Offset Offset Type Offset Area Offset Status Condition Milestones
OFFSET 1 Rehabilitation 0.3 Current
1
Milestone:

Condition Milestone 1 - relates to Permit condition 2(b)

The Permit Holder shall revegetate and rehabilitate the area hatched red on Plan 5206/1 (portion of Lot 50 on Plan 2249) by:
(i) re-shaping the surface of the land so that it is consistent with the surrounding 5 metres of uncleared land; and
(ii) ripping the ground on the contour to remove soil compaction; and
(iii) laying the vegetative material and topsoil retained under condition 2(a) on the area hatched red on Plan 5206/1.

Timeframe:

Within 6 months following clearing authorised under this permit. In accordance with condition 1 of the permit, the Permit Holder shall not clear any native vegetation after 2/11/2014.

Complete: No
2
Milestone:

Condition Milestone 2 - relates to Permit condition 2(c)

The Permit Holder shall:
(i) engage an environmental specialist to determine the species composition, structure and density of the area revegetated and rehabilitated; and
(ii) where, in the opinion of an environmental specialist, the composition structure and density determined under condition 2(c)(i) will not result in a similar species composition, structure and density to that of pre-clearing vegetation types in that area, revegetate the area by deliberately planting and/or direct seeding native vegetation that will result in a similar species composition, structure and density of native vegetation to pre-clearing vegetation types in that area and ensuring only local provenance seeds and propagating material are used.

Timeframe:

Within 18 months of laying the vegetative material and topsoil in accordance with condition 2(b).

Complete: No
3
Milestone:

Condition Milestone 3 - relates to Permit condition 2(d)

Where additional planting or direct seeding of native vegetation is undertaken in accordance with condition 2(c)(ii), the Permit Holder shall repeat condition 2(c)(i) and 2(c)(ii).

Timeframe:

If required, within 24 months of undertaking the additional planting or direct seeding of native vegetation.

Complete: No
4
Milestone:

Condition Milestone 4 - relates to Permit condition 2(e)

Where a determination by an environmental specialist that the composition, structure and density within areas revegetated and rehabilitated will result in a similar species composition, structure and density to that of pre-clearing vegetation types in that area, as determined in condition 2(c)(i) and (ii), that determination shall be submitted for the CEO’s consideration. If the CEO does not agree with the determination made under condition 2(c)(ii), the CEO may require the Permit Holder to undertake additional planting and direct seeding in accordance with the requirements under condition 2(c)(ii).

Timeframe:

Prior to the expiry of the permit.

Timeframe (date): 2019-11-02
Complete: No