Current Projects 278 Projects

Customised reports can be made using search register function
# Project Name Project Number Project Area (ha) Proponent Offset Info
11 Clearing for project activities throughout the southwest of Western Australia for Western Power's 'South West Interconnected System' transmission network (north to Kalbarri, east to Kalgoorlie and south to Ravensthorpe). 1918/6 0.0 Electricity Networks Corporation, trading as Western Power
Offset Type Offset Area (ha) Status
Other 0.0 Current
12 Clearing of 0.152 hectares of native vegetation for the purpose of a pedestrian pathway and boardwalk on Lot 612 on Plan 10292, Lot 12835 on Plan 21310 (Reserve 45385) and Compass Circle road reserve, Yanchep. 1974/5 0.152 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 0.547 Current
13 Realignment and widening of Brazier Road, Yanchep. 2184/3 1.188 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 2.37 Current
14 Clearing of 10 hectares of native vegetation for the purpose of fenceline construction and maintenance in the Shires of Goomalling and Wongan-Ballidu. 2418/2 10.0 Jameson Farm Pty Ltd
Offset Type Offset Area (ha) Status
Other None Current
15 Limestone Resources Australia Pty Ltd has applied to clear up to 6.4 hectares of native vegetation for the expansion of limestone mining operations. The proposal involves clearing approximately 1.8 hectares of vegetation community LWBa and approximately 4.6 hectares of TOSBsOSXp. Vegetation and topsoil will be cleared using a bulldozer, and stockpiled for later use in rehabilitation activities (Landform Research, 2008). Vegetation and topsoil will be cleared using a bulldozer, and stockpiled for later use in rehabilitation activities (Limestone Building Block Company, 2009). 2858/1 1.08 Limestone Resources Australia Pty Ltd
Offset Type Offset Area (ha) Status
Other 0.0 Current
16 Clearing of 29.72 hectares of native vegetation for the purpose of sand extraction on Lot M1448 on Diagram 6412 Lennard Brook. 2860/7 29.72 Hanson Construction Materials Pty Ltd
Offset Type Offset Area (ha) Status
Rehabilitation 5.26 Current
Rehabilitation 21.59 Current
17 Kununurra Heavy Vehicle Route Stage 1 2892/5 60.0 Commissioner of Main Roads Western Australia
Offset Type Offset Area (ha) Status
Land acquisition 67.0 Current
18 Clearing of 109 hectares of native vegetation for the purpose of horticulture in the Shire of Gingin. 2926/4 109.0 North East Equity Pty Ltd
Offset Type Offset Area (ha) Status
Onground management 215.0 Current
Land acquisition 27.0 Complete
19 Clearing of 1.4 hectares of native vegetation for the purpose of extractive industry in Myrup, Shire of Esperance 3015/4 1.4 CEMEX Australia Pty Limited
Offset Type Offset Area (ha) Status
Land acquisition 1.4 Complete
20 Galaxy Resources propose to clear up to 15 hectares of remnant native vegetation on cleared agricultural land, located approximately 1 kilometre north-west of Ravensthorpe (GIS Database). The application area totals approximately 480 hectares. The proposed clearing will allow Galaxy Resources to commence mining operations (colloquially termed the Ravensthorpe Spodumene Project). The project will involve establishing an open cut pit and constructing associated infrastructure including a tailings storage facility, waste dump, processing plant, access roads and stockpile areas (Keith Lindbeck and Associates, 2009). Vegetation will be cleared via mechanical means and vegetation and topsoil will be stockpiled separately for use in rehabilitation works (Keith Lindbeck and Associates, 2009). 3045/5 15.0 Galaxy Resources Limited
Offset Type Offset Area (ha) Status
Rehabilitation 44.0 Current