# Project Name Project Number Project Area (ha) Proponent Offset Info
51 Clearing of 11.6 hectares of native vegetation for the purpose of sand extraction, Oldbury 4935/2 11.6 Hanson Construction Materials Pty Ltd
Offset Type Offset Area (ha) Status
Land acquisition 35.46 Complete
Land acquisition 11.6 Current
52 Clearing of 2.5 hectares of native vegetation for the purpose of road widening and construction in the Shire of Kellerberrin. 5028/1 2.5 Shire of Kellerberrin
Offset Type Offset Area (ha) Status
Rehabilitation 5.0 Current
53 Clearing of 1.35 hectares for the purpose of a timber lay down area, access track and fire hazard reduction 5029/2 1.35 Koppers Wood Products Pty Ltd
Offset Type Offset Area (ha) Status
Land acquisition 1.66 Current
Rehabilitation 1.72 Current
54 Clearing of 2.8 hectares within the Shire of Dardanup for the purpose of gravel extraction, with the site to be used post extraction as a dam and pasture for stock grazing. 5036/2 2.8 Mr Joshua and Ms Joanna Giumelli
Offset Type Offset Area (ha) Status
Rehabilitation 0.6 Current
55 Greenbushes Project. 5056/2 120.0 Talison Lithium Australia Pty Ltd Talison Lithium Australia Pty Ltd
Offset Type Offset Area (ha) Status
Land acquisition 121.7 Current
56 Clearing of 3.44 hectares of native vegetation for the purpose of constructing a dam and water catchment and extending an existing vineyard. 5063/2 3.44 Vasse Felix Pty Ltd
Offset Type Offset Area (ha) Status
Land acquisition, Onground management 4.7 Current
57 Clearing of 0.112 ha of native vegetation for the purpose of road improvements, shared path realignment and drainage works, including a new drainage bubble-up pit. 5087/3 0.112 Department of Transport
Offset Type Offset Area (ha) Status
Onground management 0.386 Current
58 Clearing of 0.74 hectares of native vegetation for the purpose of building a carpark and hardstand construction. 5206/1 0.74 Colin Michael Piacentini
Offset Type Offset Area (ha) Status
Rehabilitation 0.3 Current
59 Gateway WA Stage 1 (Perth Airport and Freight Access Project) 5242/6 114.7 Commissioner of Main Roads Western Australia
Offset Type Offset Area (ha) Status
Land acquisition 154.0 Complete
Rehabilitation 3.0 Current
Land acquisition 1.0 Current
Land acquisition 28.06 Current
60 To clear one hectare of native vegetation within Lot 304 on Deposited Plan 50027, Walpole, for the purpose of dam construction. 5270/1 1.0 Walpole Country Club Inc
Offset Type Offset Area (ha) Status
Onground management 15.86 Current
Land acquisition 15.68 Current