Offset conditions | 11. Retain vegetative material and topsoil, revegetation and rehabilitation
The Permit Holder shall: (a) retain the vegetative material and topsoil removed by clearing authorised under this Permit and stockpile the vegetative material and topsoil in an area that has already been cleared. (b) within 6 months following clearing authorised under this permit, revegetate and rehabilitate within the areas cross-hatched red on attached Plan 5375/1 by: (i) re-shaping the surface of the land so that it is consistent with the surrounding 5 metres of uncleared land; and (ii) ripping the ground on the contour to remove soil compaction; and (iii) laying the vegetative material and topsoil retained under condition 11(a) on the red hatched area(s). (c) within 18 months of laying the vegetative material and topsoil on the cleared area in accordance with condition 11(b) of this Permit: (i) engage an environmental specialist to determine the species composition, structure and density of the area revegetated and rehabilitated; and (ii) where, in the opinion of an environmental specialist, the composition structure and density determined under condition 11(c)(i) of this Permit will not result in a similar species composition, structure and density to that of pre-clearing vegetation types in that area, revegetate the area by deliberately planting and/or direct seeding native vegetation that will result in a similar species composition, structure and density of native vegetation to pre-clearing vegetation types in that area and ensuring only local provenance seeds and propagating material are used. (d) Where additional planting or direct seeding of native vegetation is undertaken in accordance with condition 11(c)(ii) of this permit, the Permit Holder shall repeat condition 11(c)(i) and 11(c)(ii) within 24 months of undertaking the additional planting or direct seeding of native vegetation. (e) Where a determination by an environmental specialist that the composition, structure and density within areas revegetated and rehabilitated will result in a similar species composition, structure and density to that of pre-clearing vegetation types in that area, as determined in condition 11(c)(i) and (ii) of this permit, that determination shall be submitted for the CEO’s consideration. If the CEO does not agree with the determination made under condition 11(c)(ii), the CEO may require the Permit Holder to undertake additional planting and direct seeding in accordance with the requirements under condition 11(c)(ii). |